background image

8

2

ENGLISH |

Table of Contents

Introduction .................................................................................................................3

Setup Instructions......................................................................................................4

Operating Instructions .........................................................................................5-7

DX6 Parts List ...............................................................................................................8

DX6 Mechanical Drawing........................................................................................9

Maintenance Schedule....................................................................................10-12

Troubleshooting Tips ............................................................................................. 13

Vise Data

Use this t

o fill out inf

ormation about your vise for quick reference.

Purchase Date:

_______ -_______- _______

Purchase Order:

_______________________

Purchased From: _______________________
Delivery Date:

_______________________

Serial No.:

_______________________

Note:

Make sure to register your warranty online at kurtworkholding.com

Table of Contents

CAUTION:

Is used when your action or lack of action may cause serious 

injury.

OPERATING INSTRUCTIONS

SURFACE MOUNT

ING THE DTR20

 

T

he 

DTR20 can be located and mounted using a slip fit 1/2 inch center 

dowel pin and 3/8-16 socket head cap screws.  

English Mounting:

The D

TR20

 can be properly 

located

 using the 

1/2" slip fit dowel

 

indicated by 

M

 in figure 

4

 above.  

The DTR20 can be bolted down 

using the 8 3/8-16 holes indicated in figure 4 above by L.  

JAW POSITIONING

Fig.

5     

Note: 

Dimensions below are in inches unless specified.

The DTR20 has reversible jaws that allow for more part size variation.  See the

below figure to see the two jaw configuration options and opening 

capabilities. 

Summary of Contents for DTR20

Page 1: ...DTR20 DOVELOCK DOVETAIL 5 AXIS VISE Operating Instruction Manual DTR20 ENGLISH...

Page 2: ...ill out information about your vise for quick reference Purchase Date Purchase Order Purchased From Delivery Date Serial No _________ ________ _________ ______________________________ ________________...

Page 3: ...bearings increases jaw clamping pressure Other features include 80 000 psi ductile iron body hardened vise bed jaw plates semi hard steel screw Introduction INTRODUCTION Thank you for purchasing a Ku...

Page 4: ...the vise must be free of any chips dirt or debris of any kind The mounting surface can be honed if necessary Clean the bottom of the vise with solvent or another cleaner if needed To minimize vise bed...

Page 5: ...ou need more clamping force you may require a larger vise To properly clamp a part in your Kurt vise you should place the part in the center of the jaws resting on the ways of the vise Clamping only o...

Page 6: ...6 Fig 2 Sketch 2A Incorrect part clamping Vise width centerline Sketch 2B Correct part clamping Sketch 2C Correct part clamping Sketch 2D Correct part clamping Dummy spacer OPERATING INSTRUCTIONS...

Page 7: ...OPERATING INSTRUCTIONS DIMENSIONAL VIEWS 7 Fig 4 Note Dimensions below are in inches unless specified...

Page 8: ...ed and mounted using a slip fit 1 2 inch center dowel pin and 3 8 16 socket head cap screws English Mounting The DTR20 can be properly located using the 1 2 slip fit dowel indicated by M in figure 4 a...

Page 9: ...figure 7 from the other side of the stationary jaw 4 Insert the movable jaw and screw on the other side of the vise 5 Tighten the set screw in the movable jaw so that it is retained again 6 Insert the...

Page 10: ...TR20 147 Retaining Ring 2 11 3400V 191 Protective Plug 8 13 DTR20 314 1 14 3600V 191 Protective Plug 1 15 DLU4 96 O ring 016 1 16 DT20 231 Retaining Ring 1 17 Product Logo Sticker 1 18 DTR20 355 Preci...

Page 11: ...DTR20 MECHANICAL DRAWING 9 ENLGISH DX6 Mechanical Drawing DX6 Mechanical Drawing DTR20 Mechanical Drawing Fig 7 11...

Page 12: ...pen the vise to the maximum opening 2 Remove the main screw 4 in Fig 7 3 Remove and inspect the thrust bearing and washers 5 6 in Fig 7 4 Remove the protective plug 12 13 in Fig 7 from the back 5 Remo...

Page 13: ...e jammed Properly clean and grease vise Problem My vise will not turn in either direction Tip The vise is jammed with debris Disassemble and clean as needed Problem My vise won t hold tolerance Tip Yo...

Page 14: ...MAINTENANCE LOG NOTES MAINTENANCE LOG NOTES 14...

Page 15: ...all be limited to the replacement or repair of any Kurt product or part by an authorized Kurt technician which are returned to Kurt Manufacturing Company s place of business transportation shipping an...

Page 16: ...y feedback or questions please contact us at kurtworkholding com Kurt Industrial Products A Division Of Kurt Manufacturing 9445 East River Road NW Mpls MN 55433 workholding kurt com Phone 763 574 8309...

Reviews: