Kuranda Cat Tower Assembly Instructions Manual Download Page 3

Fig. 1-A

Fig. 1-C

Fig. 1-B

Insert the fabric into the channel on each 
length of frame pipe.  There are 2 long 
sides and 2 short sides for each nest.  
See Fig 1-A  

(1)

TOP 

NEST 

A

(1) 

TOP 

NEST 

B

NEST

Type 

NOTE:  TIGHTEN PROPERLY 
Correct tightening will leave end of bolt 
flush with the nuts’ white nylon locking 
material.  

INSUFFICIENT OR OVER 

TIGHTENING OF THE CORNERS MAY 
RESULT IN CRACKING.

For each of the remaining Nests Type C, 
assemble each corner combining 2 bottom 
corner pieces with 2 panhead screws.
See Fig 1-C

Assemble (1) 
Top Nest B using 
2 top & bottom 
corners with 4 
flat top machine 
screws (Fig 1-B) 
on one side.  On 
the  remaining 2 
corners connect 
2 bottom corners 
with 2 panhead 
screws.
See Fig 1-C.

Assemble (1) 
Top Nest A 
using 4 top 
corners, 4 
bottom corners 
and 8 flat top 
machine 
screws.
See Fig 1-B

Step 1.  Assemble the Nests

Summary of Contents for Cat Tower

Page 1: ...rews 44 pan head screws 2 56 lock nuts Tools Needed Phillips Head Screwdriver 7 16 Wrench or Adjustable Wrench level rubber mallet Flat surface to work on Assembly Instructions For Kuranda 7 Tier Cat Tower 7 Nest Cat Tower Parts List Fabric mats Gray leg caps PVC leg pipes 2 5 7 11 2 75 pan head screws with locknuts Machine screws with locknuts PVC frame pipe Long 16 Short 11 16 top corners bottom...

Page 2: ...DOG BEDS ARE GUARANTEED CHEWPROOF FOR ONE FULL YEAR Kuranda guarantees the structural integrity of the frames and fabrics of their beds against chewing for a period of one year from date of purchase Accordingly Kuranda will replace frame parts and fabric damaged by cats chewing the bed only to the point of not being useable at no charge during this period This warranty excludes damage caused by ca...

Page 3: ...NSUFFICIENT OR OVER TIGHTENING OF THE CORNERS MAY RESULT IN CRACKING For each of the remaining Nests Type C assemble each corner combining 2 bottom corner pieces with 2 panhead screws See Fig 1 C Assemble 1 Top Nest B using 2 top bottom corners with 4 flat top machine screws Fig 1 B on one side On the remaining 2 corners connect 2 bottom corners with 2 panhead screws See Fig 1 C Assemble 1 Top Nes...

Page 4: ...ace this nest over the Base Nest inserting the two bottom corner openings onto the 2 Base Nest upright 2 5 legs Using a level tap gently with a rubber mallet to make sure the nest is secure and level Insert 2 7 legs into the center openings Insert 2 16 legs into the outside corner openings See Fig 2 B Fig 2 B Base Nest NEST Type C 11 11 7 7 16 16 7 2 legs Base Nest Type C Fig 2 A 11 11 Place a Nes...

Page 5: ...7 16 16 Fig 3 C TOP NEST B TOP NEST A Fig 3 D Step 4 Add the Top Nests Continue to stack the nests and build the tower by Inserting 2 7 legs into the center openings and 2 16 legs onto both of the outside corners of the tower Add each Nest type C tapping as necessary to secure and level each nest into place See Fig 3 B Place Top Nest A to complete the final level of the tower Level and secure into...

Page 6: ...762Wx508Lx1423H 8 Tiers 762Wx508Lx1677H 9 Tiers 762Wx508Lx1931H 3 Tiers 762Wx508Lx407H 2 Tiers 508Wx381Lx610H 4Tiers 762Wx508Lx661H Therian Pty Ltd Unit 4 26 Commercial Drive Ashmore QLD 4214 Australia www therian com au 1800 251 766 info therian com au All dimension are in millimeters ...

Reviews: