![Kuhse KEA 291 NSTR Operating Instructions Manual Download Page 10](http://html1.mh-extra.com/html/kuhse/kea-291-nstr/kea-291-nstr_operating-instructions-manual_2009590010.webp)
10 / 14
- Operating instructions for KEA 252 PA
– File:
BA_KEA 291
NSTR_EN_Ver
2015-03-
20_EN.doc
-
10 / 14
10
Alfred Kuhse GmbH
Telephone: +49 4171-798-0
E-mail: [email protected]
Subject to technical changes
An der Kleinbahn 39,21423 Winsen
Fax: +49 (0) 4171-798-117
http://www.kuhse.de
13.
Start program
13.1.
Start process, diesel engine
Start delay 2 sec.
Starter on for 10 sec.
Pause 7 sec.
3 start attempts
6 start attempts for sprinkler operation
Delay
MONITORING ON
7 sec.
Switch-back delay 60 sec.
Idle time 180 sec.
Sprinkler operation run-on time 600 sec.
Stop time 30 sec.
13.2.
Start process, gas engine
Starter on
If the starter speed is exceeded, the switching-on of the ignition is delayed (e.g. after 2 sec.)
Then (another 2 sec.) open gas solenoid valve
Starter now on for another 7 seconds
Then close gas solenoid valve
Starter off
Ignition off after 6 sec.
New start sequence after 1 sec.
The parameterised standard values for a diesel engine are specified here. If diesel engines with preheat-
ing systems are used, an external preheating button must be provided in the M
ANUAL
selector switch posi-
tion. The start delay serves as a preheating time during automatic starts.