Power harrows
66
HR303D/M
Optional equipment
Parking
Instructions for transport
Putting the machine into transport position
From the working position:
- Remove the hydraulic attachment stroke limiter chain.
- Uncouple the PTO shaft (between the power harrow
and the additional machine).
- Completely raise the hydraulic lift linkage.
- Fit safety plate (1).
- Insert and secure lynch pin (2).
Maintenance
Every 100 hours
Grease:
- Pivot points.
When parking the power harrow/additional
machine unit, make sure that the additional
machine is lowered first.
Summary of Contents for HR303D
Page 1: ...OPERATOR S MANUAL Power harrows HR303D M KN110FGB A English 12 2006...
Page 2: ......
Page 91: ...Limited warranty Power harrows HR303D M 89 LIMITED WARRANTY...
Page 92: ...Power harrows 90 HR303D M Limited warranty...
Page 93: ......
Page 94: ......
Page 95: ......
Page 96: ......