Rotary cultivators
20
EL23
Putting into service
$
PUTTING INTO SERVICE
1. Coupling and uncoupling
Description of coupling elements
- A PTO shaft 1 3/8’’ - 6 splines.
- A 3-point hitch.
Preparing the tractor
The machine adapts to tractors fitted with a 3 point
linkage category 1.
The tractor nominal PTO speed must be 540 min
-1
.
Hitch pin parallelism
Adjust tractor lift rods so that hitch pins are parallel to the
ground.