Maintenance and repair
169
C
AXIS
20.1
AXIS
20.1
AXIS
30.1 (W), AXIS 40.1 (W)
AXIS 50.1 W
C.5
Metering slide adjustment
Check that the metering slides open evenly before every working season and
during the season if necessary.
Requirements:
The mechanics must be freely movable to check the metering slide setting.
Actuator is disengaged.
Running the test (example on left side of spreader):
2.
Push the metering slide against the pin.
The pointer must point to 85 on the metering slide scale. If position is
not correct, the scale must be adjusted.
n
WARNING
Danger of crushing and shearing!
Power-operated components (adjustment lever, metering
slide) may crush and shear when working on them.
Pay attention to the shear points of the metering outlet and
slides during all adjustment work.
Turn off tractor. Remove the ignition key.
Do not operate hydraulic slide actuators during adjust-
ment work.
1.
Take a lower link pin
d = 28
mm
and insert it centrally
into the outlet.
Figure 18:
Lower link pin in metering outlet
Summary of Contents for AXIS 20.1
Page 4: ......
Page 12: ...Contents VIII...
Page 14: ...Intended use 1 2 AXIS GENERAL...
Page 46: ...Transport without tractor 6 34 AXIS GENERAL...
Page 48: ...Instructions regarding the spreading process 7 36 AXIS GENERAL...
Page 156: ...Maintenance and repair C 144 AXIS GENERAL AXIS 20 1 AXIS 30 1 W AXIS 40 1 W...
Page 194: ...Appendix D 182 AXIS GENERAL AXIS 20 1 AXIS 30 1 W AXIS 40 1 W AXIS 50 1 W...
Page 214: ......
Page 215: ......