- 18 -
MACHINE ASSEMBLY
Install tool box using the screws pre-fitted on
the drawbar.
Fit the secondary PTO shaft onto the slip
clutch using the pre-fitted screws.
Torque : 7 daNm (52 ft.lbs).
After having removed the clamp bolt, drive the
yoke into the splined shaft of the side gearbox.
Secure the yoke using the clamp bolt (the bolt
concave part against the shaft).
Torque : 7 daNm (52 ft.lbs).
Summary of Contents for FC 303 GL
Page 1: ...PREDELIVERY INSTRUCTIONS FC 303 GL RGL N 95132 B GB 02 2004 ...
Page 5: ... 4 TECHNICAL SPECIFICATIONS ...
Page 32: ... 31 ...
Page 33: ... 32 ...
Page 34: ... 33 ...