
37
THREE-POINT HITCH & DRAWBAR
ENGLISH
3-POINT HITCH
B
Selecting the holes of lower links
There are three holes in the lower links. For most
operations the lifting rods should be attached to the (B)
hole.
A
The lifting rods may be attached to (A) hole for higher
lifting height. (with reduced lifting force)
A
The lifting rods may be attached to (C) for greater
lifting force.
B
Selecting the top link mounting holes
Select the proper set of holes by referring to the
"Hydraulic Control Unit Use Reference Chart" in
"HYDRAULIC UNIT" section.
B
Drawbar
Remove the drawbar if a close mounted implement is
attached.
To avoid personal injury:
A
Be sure to stop the engine.
A
Do not stand between tractor and implement
unless parking brake is applied.
A
Before attaching or detaching implement,
locate the tractor and implement on a firm level
surface.
A
Whenever an implement or other attachment is
connected to the tractor 3-point hitch, check
full range of operation for interference, binding
or PTO separation.
B
Lifting Rod (Right)
Level a 3-point mounted implement from side to side by
turning the adjusting handle to shorten or lengthen the
adjustable lifting rod with the implement on the ground.
After adjustment, tighten the lock nut securely.
B
Top Link
1. Adjust the angle of the implement to the desired
position by shortening or lengthening the top link.
2. The proper length of the top link varies according to
the type of implement being used.
1. Make preparations for attaching
implement.
(1) Lower link
(2) Lifting rod
Holes: (A),(B),(C)
2. Attaching and detaching implements
(1) Adjusting handle
(2) Lock nut