Drill - 132
RT120Q Operator’s Manual
Operate
Start Bore with Drill String Guide
If necessary, have helper follow the instructions below to operate the drill string guide at start of bore.
1.
Stand on
left
side of approach trench.
2.
Put drill string guide in correct position:
•
at least 3’ (1 m) behind drill bit
•
hook side toward bore
•
cradle side toward machine
3.
When drill string guide is in correct position, signal machine operator to start bore.
4.
Use drill string guide to control the first 5’ (1.5 m) of the bore path.
5.
When length of bore is 5’ (1.5 m), have machine operator stop machine.
6.
When drill string has stopped, remove drill string guide and leave area.
Rotating shaft will cause death or serious injury. Stay
away.
To help avoid injury:
•
Use only the approved Ditch Witch
®
drill string guide (p/n 118-079).
•
Do not straddle trench or drill string.
•
Do not enter trench.
•
Keep hands and feet away from drill string and drilling attachment.
•
Do not use drill string guide during backreaming or when drill string is being pulled back.
•
Only use drill string guide on left side of approach trench.
t48om059w.eps
Summary of Contents for RT120Q
Page 1: ...RT120Q Operator s Manual Issue 2 0 Original Instruction 053 2634 ...
Page 7: ...Overview 6 RT120Q Operator s Manual About This Manual ...
Page 75: ...Operation Overview 74 RT120Q Operator s Manual Leaving Jobsite ...
Page 83: ...Prepare 82 RT120Q Operator s Manual Check Supplies and Prepare Equipment ...
Page 89: ...Drive 88 RT120Q Operator s Manual Shut Down ...
Page 101: ...Transport 100 RT120Q Operator s Manual Retrieve ...
Page 115: ...Plow 114 RT120Q Operator s Manual Finish Job ...
Page 127: ...Backhoe 126 RT120Q Operator s Manual Finish Job ...
Page 140: ...RT120Q Operator s Manual Saw 139 Saw Chapter Contents Set Up 140 Operate 141 Finish Job 143 ...
Page 145: ...Saw 144 RT120Q Operator s Manual Finish Job ...
Page 193: ...Service 192 RT120Q Operator s Manual As Needed ...
Page 213: ...Specifications 212 RT120Q Operator s Manual Declaration of Conformity Information ...
Page 216: ......
Page 217: ......
Page 218: ...RT120Q Operator s Manual Service Record 217 Service Record Service Performed Date Hours ...
Page 219: ...Service Record 218 RT120Q Operator s Manual Service Performed Date Hours ...