Backhoe - 124
RT120Q Operator’s Manual
Finish Job
Finish Job
1.
Raise stabilizers fully to engage latch.
2.
Return remote throttle to low.
3.
Lift boom while keeping dipper pointed at
ground (shown).
4.
Curl bucket closed and move dipper fully
toward boom (shown).
5.
Lift boom to highest position and latch
stow lock.
6.
Lower boom slightly to engage lock.
7.
Engage swing lock. See page 65.
IMPORTANT:
For tractor to
function once operator has
returned to operator station,
stabilizers must be raised, remote
throttle must be set at low, and
boom must be stowed and locked.
Summary of Contents for RT120Q
Page 1: ...RT120Q Operator s Manual Issue 2 0 Original Instruction 053 2634 ...
Page 7: ...Overview 6 RT120Q Operator s Manual About This Manual ...
Page 75: ...Operation Overview 74 RT120Q Operator s Manual Leaving Jobsite ...
Page 83: ...Prepare 82 RT120Q Operator s Manual Check Supplies and Prepare Equipment ...
Page 89: ...Drive 88 RT120Q Operator s Manual Shut Down ...
Page 101: ...Transport 100 RT120Q Operator s Manual Retrieve ...
Page 115: ...Plow 114 RT120Q Operator s Manual Finish Job ...
Page 127: ...Backhoe 126 RT120Q Operator s Manual Finish Job ...
Page 140: ...RT120Q Operator s Manual Saw 139 Saw Chapter Contents Set Up 140 Operate 141 Finish Job 143 ...
Page 145: ...Saw 144 RT120Q Operator s Manual Finish Job ...
Page 193: ...Service 192 RT120Q Operator s Manual As Needed ...
Page 213: ...Specifications 212 RT120Q Operator s Manual Declaration of Conformity Information ...
Page 216: ......
Page 217: ......
Page 218: ...RT120Q Operator s Manual Service Record 217 Service Record Service Performed Date Hours ...
Page 219: ...Service Record 218 RT120Q Operator s Manual Service Performed Date Hours ...