OPERATING THE LOADER
28
B
Adjustment of Spill Guard Link
To avoid personal injury:
A
Keep your hand away from links or boom when
operating the loader.
1. Start engine and lift the boom to appointed height (L).
2. Rolled back the bucket fully and check the rollback
angle (A).
3. If the rollback angle is not the same as following
illustration, adjust the length of connecting rod.
C
Adjustment of spill guard link
1. Remove the cotter pin.
2. Remove the rod from the link.
3. Unfasten the lock nut and adjust the length of
connecting rod by turning rod.
A
Adjust the length of the rod as shown below.
4. Tighten the lock nut and set the rod to the link with the
cotter pin.
(A) 60 [LA805]
60 [LA1055]
(H) Highest position
(1) Link
(2) Connecting rod
(3) Lock nut
(4) Cotter pin
(5) Rod
Condition of the bucket at
appointed height
Adjustment
Bucket rolled back too far
Shorten connecting rod
Bucket dumped too far
Lengthen connecting rod
(L) 1210 to 1260 mm [LA805]
1280 to 1335 mm [LA1055]
Summary of Contents for LA1055
Page 2: ......
Page 4: ......
Page 9: ...3 SAFE OPERATION DANGER WARNING AND CAUTION LABELS...
Page 10: ...SAFE OPERATION 4...
Page 12: ......
Page 17: ...5 SPECIFICATIONS LA555 LA805 LA1055...
Page 49: ......