Section 1: Assembly & Set-up
4/9/19
AP-SA35 Hydraulic Post Hole Digger 317-093MK
12
o
Kubota Hose Stay Kit
Figure 1-7
2.
Clean quick disconnect couplers of dirt and connect
male and female couplers to the Skid Steer/Tractor
high pressure outlets. Make sure they have fully
engaged. If they have not, check the followings:
•
Make sure couplers are same size and type.
•
Make sure hydraulic pressure has been released.
3.
Make sure hoses are kept away from all pinch points
and then zip tie hoses together as needed. Two zip
ties are provided for this purpose.
4.
Operate Skid Steer/Tractor to check auger rotation.
The auger should rotate clockwise when looking
down from above. If auger rotates counterclockwise,
switch male and female couplers on the hydraulic
hoses and then reconnect hoses to the outlets.
5.
Also see Hydraulic Hook-up instructions in your Skid
Steer/Tractor Operator’s Manual.
Auger Assembly
Refer to Figure 1-8:
1.
Position mounting holes in auger tube (#3) in line
with hole in gearbox output shaft (#4).
37393
Hose Stay Kit
NOTE:
If attaching to a Kubota skid steer, route
hydraulic hoses through Kubota’s SVL or SSV Hose
Stay as shown in Figure 1-7. Purchase
SVL Hose
Stay #S6689 or SSV Hose Stay #77700-07225
through your nearest Kubota dealer. Refer to your
skid steer Operator’s Manual for more instructions.
NOTE:
Augers are supplied with either a 2 9/16" dia.
round hub or 2" hex hub. Make sure gearbox output
shaft matches the auger hub.
Auger Screw Assembly
Figure 1-8
2.
Slide auger tube (#3) over gearbox output shaft (#4)
and install:
•
Round Hub - 7/8"-9 x 5" GR5 cap screw (#1) and
nylock nut (#2).
•
Hex Hub - 3/4"- 10 x 4 1/2" GR5 cap screw (#1) and
nylock nut (#2).
3.
Tighten hardware to proper torque.
19232
Clockwise Rotation
Auger Tip
Hydraulic Hoses
Auger Flighting