2
SETUP
3
2.1
Unpacking and setting up the vehicle
201935-10
–
Remove the box and the plastic packaging.
Info
An assistant prevents the motorcycle from falling over.
To avoid damaging the motorcycle during the setup, leave the protective
film on the vehicle until you have finished.
–
Remove the separate enclosure and unpack it. Check that the scope of supply is
complete on the basis of the enclosed packing list.
–
Have a lift stand available.
Lift stand (54829055000)
–
Together with an assistant, take the vehicle off the palette.
201936-10
–
Position the vehicle on a lift stand.
–
Check the vehicle for transport damage.
201937-10
–
Remove the tension belt.
The cable rebounds.
–
Remove screw
1
and wheel spindle. Lift the front wheel into the fork, position it,
and insert the wheel spindle.
–
Mount and tighten the screw of the wheel spindle.
Guideline
Screw, front wheel spindle
M20x1.5
35 Nm
(25.8 lbf ft)
201938-10
–
Position the fender. Mount and tighten screws.
Guideline
Remaining screws, chassis
M6
10 Nm (7.4 lbf ft)
201939-10
–
Unpack the shock absorber.
–
Position the shock absorber. Mount and tighten screws.
Guideline
Screw, top shock absorber
M12
60 Nm
(44.3 lbf ft)
Loctite
®
243™
Screw, bottom shock
absorber
M12
60 Nm
(44.3 lbf ft)
Loctite
®
243™
The longer screw is used at the bottom.