11
SERVICE WORK ON THE CHASSIS
50
Finishing work
–
Install the air filter box lid. (
11.27
Securing the air filter box lid
Preparatory work
–
Remove the air filter box lid. (
S00846-10
Main work
–
Drill a hole at the marking
.
Guideline
Diameter
6 mm (0.24 in)
Finishing work
–
Install the air filter box lid. (
11.28
Sealing the air filter box
Preparatory work
–
Remove the air filter box lid. (
S00847-10
Main work
–
Seal the air filter box in the marked area
.
Finishing work
–
Install the air filter box lid. (
11.29
Removing the main silencer
Warning
Danger of burns
The exhaust system gets very hot when the vehicle is driven.
–
Allow the exhaust system to cool down. Do not touch hot components.
102180-10
–
Disconnect spring
.
Spring hooks (50305017000)
–
Remove screws
and take off the main silencer.