11
SERVICE WORK ON THE CHASSIS
48
M01136-10
Main work
–
Remove screw
.
–
Remove screw
.
–
Pull off the upper triple clamp with the handlebar and hang to the side.
Info
Protect the components against damage by covering them.
Do not kink the cables and lines.
M01117-10
–
Remove O-ring
. Remove protective ring
.
–
Take off the lower triple clamp with the steering stem.
–
Remove the upper steering head bearing.
11.10
Installing the lower triple clamp
102146-10
Main work
–
Clean the bearing and sealing elements, check for damage, and grease.
High viscosity grease (
–
Insert the lower triple clamp with the steering stem. Mount the upper steering head
bearing.
–
Check whether the upper steering head seal
is correctly positioned.
–
Slide on protective ring
and O-ring
.
M01137-10
–
Position the upper triple clamp with the handlebar.
–
Mount screw
but do not tighten yet.
0
0
0
A
A
0
0
5
5
0
0
A
A
0
0
5
5
S00867-11
(125/150 SX EU)
–
Position the fork legs.
The air release screw
of the right fork leg is positioned to the front.
The left fork leg valve
is offset by approx. 20 to the front.
Info
The air suspension
AER
valve is located in the left fork leg.
Grooves are milled into the side of the upper end of the fork legs. The
second milled groove (from the top) must be flush with the top edge of
the upper triple clamp.