12
SERVICE WORK ON THE CHASSIS
57
K00088-11
–
Position the brake caliper. Mount and tighten screws
.
Guideline
Screw, front brake caliper
M8
25 Nm
(18.4 lbf ft)
Loctite
®
243™
–
Mount the cable binder.
–
Position the brake line, wiring harness, and clamp. Mount and tighten screws
.
Finishing work
–
Mount the handlebar cushion.
–
Install the front fender. (
–
Install the front wheel.
–
Refit the headlight mask with the headlight. (
–
Check that the wiring harness, throttle cables and brake and clutch lines can move
freely and are routed correctly.
–
Check the steering head bearing play. (
–
Remove the motorcycle from the lift stand. (
–
Check the headlight setting. (
12.12
Installing the lower triple clamp (XCF
‑
W)
B01605-10
Main work
–
Clean the bearing and sealing elements, check for damage, and grease.
High viscosity grease (
–
Insert the lower triple clamp with the steering stem. Mount the upper steering head
bearing.
–
Check whether the upper steering head seal
is correctly positioned.
–
Slide on protective ring
and O-ring
.
K00140-10
–
Position the upper triple clamp with the handlebar.
–
Mount screw
but do not tighten yet.
–
Position the clutch line, wiring harness, and voltage regulator. Mount and tighten
screws
.
Guideline
Remaining screws, chassis
M6
10 Nm (7.4 lbf ft)
Summary of Contents for 250 EXC-F EU 2010
Page 2: ......