12
SERVICE WORK ON THE CHASSIS
54
M01017-10
–
Remove O-ring
. Remove protective ring
.
–
Take off the lower triple clamp with the steering stem.
–
Remove the upper steering head bearing.
12.10
Removing the lower triple clamp (XCF
‑
W)
Preparatory work
–
Remove the headlight mask with the headlight. (
–
Raise the motorcycle with the lift stand. (
–
Remove the front wheel.
–
Remove the fork legs.
–
Remove the front fender. (
–
Remove the handlebar cushion.
M00989-10
Main work
–
Open the cable holder in front of the right radiator and detach the wiring harness.
–
Remove screws
and hang the voltage regulator to one side.
–
Release screw
and remove screw
. Take off the upper triple clamp with the
handlebar and set it aside.
Info
Protect the components against damage by covering them.
Do not bend the cables and lines.
M00990-10
–
Remove O-ring
. Remove protective ring
.
–
Take off the lower triple clamp with the steering stem.
–
Remove the upper steering head bearing.
12.11
Installing the lower triple clamp (All EXC
‑
F models)
B01604-10
Main work
–
Clean the bearing and sealing elements, check for damage, and grease.
High viscosity grease (
–
Insert the lower triple clamp with the steering stem. Mount the upper steering head
bearing.
–
Check whether the upper steering head seal
is correctly positioned.
–
Slide on protective ring
and O-ring
.
Summary of Contents for 250 EXC-F EU 2010
Page 2: ......