LCC
4
Index
Section Page
Section Page
Accessories
4.4 ........10
Aligning the Pump / Drive Train
5.3.1 .....11
Bearing Assembly Clamp Bolts
7.5.15 ...22
Bearing Assembly, mounting
7.5.7 .....20
Bearing Housing, Axial Adjustment of
7.5.13 ...21
Bearing, Taper Locknut Assembly Torque
7.5.15 ...22
Bearings
4.3.4 .......9
Bearings, mounting
7.5.2 .....18
Bills of Material
7.4.1 .....16
Casing
4.3.1 .......7
Cavitation / NPSH Performance
7.7 ........23
Check, Final
5.5 ........12
Commissioning
6.1 ........12
Commissioning, Start-up / Shutdown
6 ...........12
Connections, Auxiliary
5.4.1 .....12
Density of the Medium Handled
6.2.3 .....14
Description of the Product and Accessories
4 .............6
Design Details
4.3 ..........7
Dimensions
4.5 ........10
Drainage / Disposal
7.3 ........16
Drawing / List of Components
9 ...........28
Drawings , Sectional
7.4.1 .....16
Elastomer Lined Wet End, assembly
7.5.10 ...20
End Covers and Seals, installation
7.5.4 .....19
Expeller Running Clearance,
7.5.14 ...21
General
1 .............5
Grease Quality / Grease Changes
7.2.2.2 ..15
Guards,
5.4.2 .....12
Impeller Break-Loose Jig
7.4.2 .....16
Impeller Form
4.3.2 .......7
Impeller Lifting Jig
7.4.2 .....16
Impeller, mounting
7.5.11 ...21
Impeller, parts life
7.6.1 .....23
Installation at Site
5 ...........10
Installation, Checks to be Carried out Prior to 5.2 ........11
Installing the Pump / Unit
5.3 ........11
Lubricants
6.1.1 .....12
Lubrication
7.2.2.1 ..15
Lubrication and Lubricant Change
7.2.2 .....15
Maintenance / Inspection
7.2 ........15
Maintenance /Repair
7 ...........15
Maintenance, General Instructions
7.1 ........15
Marking of Instructions in the Manual
2.1 ..........5
Noise Characteristics
4.3.6 .....10
Oil Changes
7.2.2.3 ..16
Operating Conditions of Flow and Head
7.7 ........24
Operating Limits
6.2 ........14
Operation, Supervision of
7.2.1 .....15
Operation, Unauthorized modes
2.8 ..........6
Operational Problems and Solutions
7.7 ........23
Packing the gland
7.5.16 ...22
Personnel Qualification and Training
2.2 ..........5
Piping System Design
7.7 ........24
Piping, Allowable Forces and Moments
4.3.5 .....10
Piping, Cleaning the Plant
6.1.5 .....13
Power Supply, Connection
5.6 ........12
Priming the Pump and Other Checks
6.1.3 .....13
Reassembly , General Instructions
7.5.1 .....18
Reassembly
7.5 ........18
Safety
2 .............5
Safety Awareness
2.4 ..........5
Safety Instructions for the Operator / User
2.5 ..........5
Safety Instructions, for Maintenance
2.6 ..........5
Safety Instructions, Non-compliance with
2.3 ..........5
Safety Regulations
5.1 ........10
Seal Water Requirements
7.5.16 ...22
Shaft Seal
4.3.3 .......7
Shaft Seal, Commissioning
6.1.2 .....13
Shaft Sleeve, mounting
7.5.5 .....19
Shaft, insertion into Housing
7.5.3 .....18
Shell, mounting
7.5.9 .....20
Shell, parts life
7.6.1 .....23
Shutdown / Storage / Preservation
6.3 ........14
Shutdown
6.1.8 .....14
Shutdown, Prolonged
6.3.2 .....14
Spare Parts Stock
7.6 ........23
Spare Parts, Unauthorized Modification of
2.7 ..........6
Specifications
4.1 ..........6
Start-up Strainer
6.1.6 .....13
Storage of Elastomer Linings
6.3.3 .....15
Storage of New Pumps
6.3.1 .....14
Storage, Returning to Service after
6.4 ........15
Storage, /Short term
3.2 ..........6
Stuffing Box, mounting
7.5.6 .....19
Suction Liner, parts life
7.6.1 .....23
Suction Plate and Liner ( LCC-H only)
7.5.12 ...21
Sump Design
7.7 ........23
Switching Frequency
6.2.2 .....14
Temperature, of Medium Handled, Ambient
6.2.1 .....14
Transport
3.1 ..........6
Transport and Interim Storage
3 .............6
Trouble Shooting
8 ...........25
Wear Problems and Solutions
7.7 ........23
Wear, Parts Life
7.6.1 .....23
Weights
4.5 ........10
Summary of Contents for GIW LCC 100-400
Page 27: ...LCC 27 NOTES ...
Page 34: ......