Placing of the equipment and foundation:
1
Dig holes as displayed in figure 2. Place 80mm of compressed gravel into all four holes.
2
Place the equipment into the holes as figure 2 displays. The surface signage on the posts
should be at surface level.
3
Caution: The timber shall not have contact to the ground soil.
4
Place approximately 1/4th of the amount of concrete into each hole. Make sure the concrete
is at least 400mm below ground surface.
5
Fill up with gravel and make sure to leave space for the fall protection surface.
6
Caution: when using different types of fall protection be certain that it fulfills all safety
requirements as described on next page.
7
Caution: The swings must have a minimum ground clearance of 360mm.
Figure 2 displays the holes for the ground fasteners. All measurements are in mm.