15
TANK SUCTION ACCESSORY
Accessory to be connected to
the flexible hose to vacuum
and clean the tanks.
MICROFIBER CLOTH
Cloth to be used hooked with the
multi-purpose brush to clean
delicate surfaces, such as wooden
floors, furniture, etc. It offers a
great absorption power, reduces
the power of the steam dispensed
and reduces the friction of the
brush during the treatment
BRUSHES
These brushes must be
connected to the STEAM
LANCE. They are used to
remove resistant dirt and for
deep cleaning, even in the
corners or small spaces.
Choose the most suitable type
(ø28, 40, 60 mm) according to
the surface to be treated.
MANTAINANCE
(End user)
* Always remove the plug before cleaning
or carrying out operations on the machine.
* End user must not open or dismantle the
machine
.
For the safety of the operator and to always ensure a
perfect performance, we recommend the following
checks and maintenance:
AFTER EVERY USE:
For a correct cleaning, it is advice to clean the machine
and its accessories with a clean cloth moistened only
with a few drops of water. Do not use alcohol or other
solvents, they may damage the plastics and
components.
To maintain efficient and easy to couple the
accessories, check the o-ring seal (
steam sealing
gaskets
) and possibly wet them with a little silicone
grease.
VACUUM FUNCTION: when you finish to vacuum, it is
advisable to vacuum some water to clean the conducts
and the filter. Afterwards, dry the bucket or do not totally
close it so that it will dry itself.
PERIODICALLY:
Periodically check that the power cord does not show
signs of wear or aging. If it is damaged, it is absolutely
necessary to get it replaced by specialized personnel
before being able to re-use the appliance again.
BOILER CLEANING
(End user)
Once a year a check and boiler cleaning must be
carried out in our authorized centers.
RINSE
: It’s recommended at least every 50 hours of
operation or 2 months.
a) DISCHARGE: The machine must be cold or definitely
discharged from the steam pressure and the plug
disconnected (see pressure gauge (4a)). It is possible
to use the Boiler-Off switch (6) to completely discharge
the steam from the boiler: With the machine switched
on, turn off the Boiler-Off switch (6), insert the hose into
the machine's socket (5) and pressing the button (10)
completely dispense all the residual steam in the boiler.
(keep the dispensing active for a further minute after the
apparent steam escapes to ensure that the boiler has
been completely emptied) (see pressure gauge (4a)).
With the help of a wrench CH 21 unscrew the cap (15)
placed under the machine in correspondence of the
boiler (see image). After having taken off the cap, shake
slightly the machine to let the water and the dissolved
limestone out.
When the boiler is empty, clean and close carefully the
cap tightening it with the wrench.
b) FILLING: Fill the water tank (7), turn the machine on
and make it start again, waiting for the boiler to be re-
charged again.
(
att
: it may be that during the first charge cycle, the
“end of water” light turns on and you need to shut
down/restart the machine to complete the load)
BOILER AND TANK CLEANING:
The boiler cleaning is recommended at least every
200 hours of operation or 6 months.
1- Cleaning with suction of the plastic tank (7): Check
that the water level in the plastic water tank (7) is at
least halfway up, shake/move the machine to shake
the water and any possible deposit.
Connect the flexible hose to the connector block (5) of
the machine, and hook the
“TANK SUCTION”
accessory into the handle, insert the accessory tube
into the tank (7) and completely suck the water in it.
(Operation also possible in the tank (8))
2- The machine must be cold or definitely discharged
from the steam pressure and the plug disconnected.
Exhaust the contents of the boiler, carefully following
what described in the previous point "BOILER
DISCHARGE".
Prepare 2 liters of water and vinegar, in proportions
of about 60% vinegar 40% water.
Insert the prepared liquid in the refill tank of the
machine (7).
3- Turn on the machine, check that the Boiler-Off
Switch (6) is in the Off position, wait until the pump
finishes filling the boiler. (att: it may be that during the
first charge cycle, the water end indicator lights up
and the machine must be switched off / on again to
15
Summary of Contents for KGVC4000
Page 2: ...ITALIANO 3 ENGLISH 10 DEUTSCH 18 ESPAÑOL 26 ...
Page 34: ...NOTE 34 ...
Page 35: ...NOTE 35 ...