8
Preparation
•
The main unit should be
installed in the center of roof,
it is recommended to have a
min 100mm space around the
top unit.
•
Before installing please verify
there is suitable space in the
ceiling to accept the plenum.
•
The
installation
position
(400x400mm) should avoid
skylight, solar panels, roof
vents, heaters, lights and all
electrical connections.
Installation guide
Summary of Contents for K2400-50/EU
Page 3: ...2 Introduction Introduction ...
Page 27: ...26 Warranty The unit comes with a 2 year warranty Warraty ...
Page 29: ...28 Einführung Einführung ...
Page 53: ...52 Garantie Das Gerät hat eine 2 jährige Garantie nur auf Teile Garantie ...
Page 55: ...54 Introduktion Introduktion ...
Page 79: ...78 Garanti Enheden kommer med to års garanti Garanti ...
Page 81: ...80 Introduction Introduction ...
Page 105: ...104 Garantie L unité est couverte d une garantie de 2 ans pour les pièces uniquement Garantie ...