![Krone BiG Pack 870 HDP XC Original Operating Instructions Download Page 111](http://html1.mh-extra.com/html/krone/big-pack-870-hdp-xc/big-pack-870-hdp-xc_original-operating-instructions_2004796111.webp)
Operation
9
Finishing the tying process manually
9.18
BiG Pack 870 HDP XC
Original Operating Instructions 150000760_00_en
111
1
BP000-148
ü
The machine is shut down and safeguarded,
.
ü
The machine is disconnected from the tractor.
Initiating the tying process:
ü
.
In order to initiate the tying process, move the lever (1) backwards.
9.18
Finishing the tying process manually
BP000-071 / EQ000-072
Knotter gearbox in idle position
The knotter gearbox is in idle position if the trigger roller (1) is in the recess of the cam track (2)
of the knotter gearbox.
The tying process consists of a rotation of the cam track (2).
ü
The machine is shut down and safeguarded,
.
ü
The machine is disconnected from the tractor.
ü
The tying process has been initiated,
Working direction flywheel
Turn the flywheel (3) manually in the working direction (I) until the trigger roll (1) slides in the
recess of the cam disc (2).