![Krone Bellima F 130 Original Operating Instructions Download Page 67](http://html1.mh-extra.com/html/krone/bellima-f-130/bellima-f-130_original-operating-instructions_2004784067.webp)
Operation
8
Twine tying
8.11
Bellima F 130
Original Operating Instructions 150000148_06_en
67
Guiding twines from the storage compartment to the bale chamber
RP000-079
Guide the two twines (3) via the twine guide eyes (1) in the storage compartment floor
centrally through the twine retainers (2).
RP000-080
Insert the two twines (1) via the twine guide eyes (2) in the twine brake (3).
Guide the two twines (1) between the spring compressors (5) and the screws (4).
To set the twine brake,
RP000-081
NOTICE! The arrow (2) shows the direction of rotation of the drive roll (3).
Place the two twines (1) around the drive roll (3).
To set the number of twine layers,
.