 CAUTION

Please observe the following to ensure that the 

JSAV is not damaged during resetting:

–   Turn the reset lever gently and do not go further 

than specified.

  1 

Remove the breather screw plug.

  2 

Press the reset lever and turn through 10° until 
resistance can be felt. 

~10°

   

Hold the reset lever in this position until the lever 
can be easily turned further following pressure 
equalization. 

  4 

Press and turn the reset lever until the valve disc 
opens and clicks into place.

klack

5

The pin in the measuring unit must be at the top 

after the valve disc has clicked into place.

  6 

Screw in the breather screw plug. 

The JSAV is ready for operation.

Replacing the measuring unit

The measuring unit has to be replaced if the JSAV 

no longer opens or can no longer be reset.

We recommend cleaning the O-ring seats and 

lightly greasing the O-rings with Klüber Nontrop 

ZB91 DIN before installation.

  1 

Depressurize the system.

JSAV 25

The measuring unit is supplied with the valve disc 

assembled. 1 O-ring and 4 screws are enclosed.

  2 

Detach the impulse line from the JSAV.

4

5

3

Ensure that the O-ring is fitted in the new measur-
ing unit, see Figure

  5 

.

  6 

Follow the reverse procedure when reassembling.

  7 

Connect the impulse line to the JSAV.

  8 

Check tightness and function, see [Tightness 
test – p. 4]
 and [Checking the function – p. 4].

JSAV 40

The measuring unit is supplied with the valve disc 

assembled. 1 O-ring and 4 screws are enclosed.

  2 

Detach the impulse line from the JSAV.

4

5

6

3

8

9

7

Ensure that the O-ring is fitted in the new measur-
ing unit, see Figure

  9 

.

 10 

Replace the O-ring on the housing. The O-ring is 
part of the seal set.

The seal set is available separately as a spare part.

 11 

Follow the reverse procedure when reassembling.

 12 

Connect the impulse line to the JSAV.

 1 

Check tightness and function, see [Tightness 
test – p. 4] 
and [Checking the function – p. 4].

JSAV 50 – 100

The measuring unit is supplied with 1 O-ring and 

4 screws.

  2 

Ensure that the JSAV is closed.

   

Remove the breather screw plug.

The pin in the measuring unit must be at the bot-

tom when the JSAV is closed. 

If the JSAV is open, apply pressure to the impulse 
line to close the valve.

Summary of Contents for JSAV

Page 1: ...qualified gas technicians Electrical interventions may only be carried out by qualified electricians Conversion spare parts All technical changes are prohibited Only use OEM spare parts Transport On...

Page 2: ...e inlet and outlet Part designations JSAV 25 4 1 2 6 7 5 3 JSAV 40 1 2 9 7 6 5 8 3 4 1 Measuring unit 2 Breather screw plug 3 Reset cap 4 Impulse line connection 5 Inlet 6 Outlet 7 Arrow of direction...

Page 3: ...on and adjust ment 2 JSAV R seal pipe with approved sealing material JSAV F insert seal between pipe and unit 3 Remove screw caps or adhesive foil from the inlet and outlet on the JSAV Note direction...

Page 4: ...open see Resetting p 5 Ensure that the breather screw plug is screwed in 2 Close all manual valves at the inlet and outlet and in the relief line CAUTION Please observe the following to ensure that th...

Page 5: ...brown 0 308 906 4 120 220 1 74 3 2 crimson 0 308 906 5 190 400 2 8 5 8 orange yellow 0 308 906 6 300 550 4 35 8 orange green 0 308 906 7 Standard spring 2 Remove the breather screw plug JSAV 25 40 3 4...

Page 6: ...th the valve disc assembled 1 O ring and 4 screws are enclosed 2 Detach the impulse line from the JSAV 4 5 3 Ensure that the O ring is fitted in the new measur ing unit see Figure 5 6 Follow the rever...

Page 7: ...lacing all seals 2 Detach the impulse line from the JSAV 5 15 9 4 3 6 7 10 8 11 10 12 16 13 14 First insert the washer into the valve disc and then the O ring 17 15 18 19 16 14 Ensure that the O ring...

Page 8: ...ring unit must be at the bot tom when the JSAV is closed If the JSAV is open apply pressure to the impulse line to close the valve 2 Detach the impulse line from the JSAV 7 6 4 5 3 Press the reset lev...

Page 9: ...GGG 40 Diaphragm NBR valve seat aluminium valve stem stainless steel valve disc JSAV 25 40 steel with vulcanized NBR seal JSAV 50 100 aluminium with vulcanized NBR seal Service life The Pressure Equip...

Page 10: ...eclare that the prod ucts JSAV 25 40 marked with product ID No CE 0085AS0202 and JSAV 50 100 marked with the product ID No CE 0085AR0246 comply with the requirements of the listed Directives and Stand...

Reviews: