Checking the usage

JSAV

Safety shut-off valve for securing downstream fittings 
against excess gas pressure.

This function is only guaranteed when used within 

the specified limits – see page 7 (Technical data).

Any other use is considered as non-compliant.

Type code

Code

Description

JSAV

Safety shut-off valve

5 – 40

Nominal size

F

Rp internal thread to ISO 7-1 

NPT internal thread 

Flange PN 16 to ISO 7005

40

Max. inlet pressure p

u

 = 4 bar (58 psig)

/ 

/

Upper trip pressure p

do 

Upper and lower trip pressure p

do

/p

du

-0 

-

Without pressure test point 

Screw plug at the inlet and outlet

Part designations

JSAV 5

JSAV 40


 

  Measuring unit

  Breather screw plug

  Reset cap

4

  Impulse line connection

5

 Inlet

6

 Outlet

7

  Arrow of direction of flow

8

  Inlet p

u

 measuring connection

9

  Outlet p

d

 measuring connection

Type label

 

Max. inlet pressure p

u

, upper trip pressure p

do

 

and lower trip pressure p

du

, ambient tempera-

ture T: see type label.

www.kromschroeder.com

D-49018 Osnabrück, Germany

JSAV

p

u

: 4 bar

p

du

: 10 mbar 

(8..16)

p

do

: 140 mbar  (10..210)

T: -20 °C..+60 °C

Klasse A IS
CE-0085AS0202

www.kromschroeder.com

D-49018 Osnabrück, Germany

Installation

 CAUTION

Please observe the following to ensure that the 

JSAV is not damaged during installation:

–   Sealing material, cuttings and other impurities 

must not be allowed to get into the housing.

–   We recommend installing a filter upstream of the 

JSAV in order to protect it against impurities in 

the pipe.

–   The installation location must be dry. Do not 

store or install the JSAV in the open air.

–   Install the JSAV in the pipe free of mechanical 

stress.

–   Do not clamp the unit in a vice or use it as a 

lever. On the JSAV..R, only secure the valve by 
holding the octagon at the inlet or outlet with a 
suitable spanner. Risk of external leakage.

–   Max. inlet pressure p

u

 4 bar (58 psig).

 

Installation in the vertical or horizontal position, 
never upside down.

  

 The housing must not be in contact with ma-

sonry. Minimum clearance 20 mm (0,78"). Ensure 
that there is sufficient space for installation and 
adjustment.

  

  JSAV..R: seal pipe with approved sealing material.

  

  Remove screw caps from the inlet and outlet on 

the JSAV.

 

Note direction of flow.

Summary of Contents for JSAV 25

Page 1: ...only be carried out by qualified gas technicians Electrical interventions may only be carried out by qualified electricians Conversion spare parts All technical changes are prohibited Only use OEM sp...

Page 2: ...com D 49018 Osnabr ck Germany JSAV pu 4 bar pdu 10 mbar 8 16 pdo 140 mbar 10 210 T 20 C 60 C Klasse A IS CE 0085AS0202 www kromschroeder com D 49018 Osnabr ck Germany Installation CAUTION Please obser...

Page 3: ...on nut and compression fitting onto the impulse line On the JSAV T remove the blind plug and con nect an NPT 1 8 impulse line 5 Install the impulse line and seal with approved sealing material Ensure...

Page 4: ...pdo according to the outlet pressure pd of the pressure regulator 20 0 40 60 80 100 140 180 220 260 300 340 50 100 150 200 250 300 350 400 450 500 pd mbar p do mbar VSBV JSAV 2 Remove the breather scr...

Page 5: ...pressures pdo and pdu on the adhesive label s 10 Screw in the breather screw plug 11 Check tightness and function see page 3 Tightness test and page 4 Checking the function Resetting Ensure that the...

Page 6: ...st and page 4 Checking the function Replacing the valve disc The valve disc has to be replaced if the JSAV is leaking We recommend cleaning the O ring seats and lightly greasing the O rings with Kl be...

Page 7: ...c and replace if necessary Selecting spare parts see free PartDetective DVD www kromschroeder com Products DVD PartDetective D GB Replacing spare parts see page 5 Replacing the measuring unit see page...

Page 8: ...d functions must be checked in accordance with the section entitled Maintenance If the product passes the aforementioned function tests you can continue to use it until the next sched uled maintenance...

Reviews: