KROHNE H250 M10 Supplementary Instructions Manual Download Page 9

 INSTALLATION 

3

9

H250 M10

www.krohne.com

06/2012 - 4001058901- MA H250/M10-Ex-II2G-AD R02 en

Installation

3.1  Installation

Installation and setup must be carried out according to the applicable installation standards (e.g. 
EN 60079-14) by qualified personnel trained in explosion protection. The information given in the 
manuals and the supplementary instructions must be observed at all times.

Variable area flowmeters must be installed in such a way that 

There are no external forces affecting the indicator part.

The device is accessible for any visual inspections that are necessary, and can be viewed from 
all sides.

The nameplate is clearly visible.

It can be operated from a location with secure footing.

3.2  Special conditions

Equipotential bonding

Variable area flowmeters must be included in the equipotential bonding of the hazardous area. 

Electronics compartment lock

The variable area flowmeter's flameproof electronics compartment must be locked during 
operation. The cover of the electronics compartment is secured by a lock. An SW3 Allen screw is 
used for the safety screw. With temperature classes T6 and T5, a waiting time of 8 minutes must 
be observed prior to opening. For temperature classes T4...T1 the waiting time is not needed. 

CAUTION!

The manufacturer is not liable for any damage resulting from improper use or use other than the 
intended purpose. This applies in particular to hazards due to insufficient corrosion resistance 
and suitability of the materials in contact with product.

AD_H250_M10_II2G_R02_en_058901_PRT.book  Page 9  Tuesday, June 26, 2012  7:20 AM

Summary of Contents for H250 M10

Page 1: ...quipment category II 2G H250 M10 H250 M10 H250 M10 H250 M10 Supplementary instructions Supplementary instructions Supplementary instructions Supplementary instructions KROHNE 06 2012 4001058901 MA H25...

Page 2: ...2 5 Equipment category 6 2 6 Protection types 7 2 7 Ambient temperature temperature classes 7 2 8 Electrical data 8 3 Installation 9 3 1 Installation 9 3 2 Special conditions 9 4 Electrical connection...

Page 3: ...on his own responsibility conformity with the protection goals of Directive 94 9 EC for use in hazardous areas with gas The EC Type Test Certificate of the Physikalisch Technische Bundesanstalt PTB f...

Page 4: ...signal output with optional HART communication two programmable electronic switch outputs and a reset input 2 2 Description code The safety description code consists of the following elements positio...

Page 5: ...on code Additional markings on the housing cover SN serial number SO sales order item P A order Vxxx product configurator code AC article code 1 Device type 2 Manufacturer 3 ATEX DGRL certification ag...

Page 6: ...riable area flowmeters are designed according to EN 60079 0 2009 and EN 60079 1 2007 in Category II 2 G for use in zone 1 The parts inside the measuring unit are also approved for use in zone 1 WARNIN...

Page 7: ...a sheet The marking contains the following information The marking contains the following information The marking contains the following information The marking contains the following information II I...

Page 8: ...of connecting cable 70 C 158 F 80 C 176 F 90 C 194 F C F C F C F C F T6 40 60 40 140 85 185 85 185 85 185 T5 40 50 40 122 100 212 100 212 100 212 40 60 40 140 85 185 100 212 100 212 T4 40 50 40 122 13...

Page 9: ...h secure footing 3 2 Special conditions Equipotential bonding Variable area flowmeters must be included in the equipotential bonding of the hazardous area Electronics compartment lock The variable are...

Page 10: ...079 1 Observe the requirements of the test certificate for the cable glands Direct entry of the connecting cables by way of conduits into the flameproof enclosed terminal compartment of the device Onc...

Page 11: ...e press fitted U clamp PE terminal located in the terminal compartment If shields are to be grounded at both ends e g for EMC reasons adequate equipotential bonding is required between the two shields...

Page 12: ...l converter housing The measuring unit and the signal converter are electrically connected via an equipotential bonding conductor Any existing cable shields should be connected to earth according to a...

Page 13: ...cs compartment or digitally via the signal output HART interface 5 2 Operation Variable area flowmeters must be operated in such a way that they remain within the maximum and minimum permissible tempe...

Page 14: ...e other temperature classes Before connecting or disconnecting the electrical connection cables of the device make sure that all cables leading to the converter are isolated from the ground of the haz...

Page 15: ...s connections and the pipeline are depressurized and free of product Where environmentally critical products are concerned carefully decontaminate the wetted parts of the flange system after dismantli...

Page 16: ...il gas industry Measuring systems for the marine industry Head Office KROHNE Messtechnik GmbH Ludwig Krohne Str 5 47058 Duisburg Germany Tel 49 0 203 301 0 Fax 49 0 203 301 10389 info krohne de KROHNE...

Reviews: