8. Commissioning
9. Replacing components
Commissioning may take place only after a positive result of all the stages of the acceptance, according to
the provisions of sec. 7.1.
A partial or ‚temporary’ commissioning is prohibited.
Check whether all the warning pictograms are attached and verify that the drive and the garage door have a nameplate.
The end user should be trained in using controls, maintain mechanisms of the door
and in their adjustment, technical aids, rules of maintenance, repair and compliance with health and safety during the operation of the door
and drive in accordance with the requirements of manual and the Report Book.
Commissioning primarily involves: training of users, demonstrating the operation and providing the manual of the door with the drive along
with the regular maintenance manual, Report Book and EC/EU declaration of conformity signed by the installer for the drive with the door.
Replacing components may be carried out after cutting off the power supply by removing the plug from the socket.
The works presented below should be performed by qualified servicing team, preferably the same, which conducted the installation
of the drive.
Before replacing the fuse, cut off the power supply by pulling the plug out of the socket.
Replace the fuse with a new one. The drive uses a miniature fuse of 2.5 A F.
9.1. Replacing the fuse
9.2. Replacing the batteries in the remote control
1.
2.
2,5A L 250V
CR2032
3V
EN