13
3.
Simultaneously grasp the pair of cardboard handle cutouts at the front and
back of the carton and lift the chassis straight up out of the carton.
2 people needed
4.
Place the chassis in a safe location and remove the protective plastic
wrapping.
2 people needed
5.
Open the remaining 3 cartons of the Evolution One, using steps 1-4 above
as a guide.
2 people needed
6.
Place the power supply chassis where you intend to use the assembled ampli-
fier channel. Krell recommends that you do not move the amplifier after it is
assembled.
2 people needed
7.
Locate the 4 locating pins (23) and the power connector (24) in the top plate of
the power supply chassis. See Figure 4, on page 18.
8.
Make certain the amplifier chassis feet (13) and the amplifier power connector
(not shown) align with the 4 power supply locating pins and power supply
power connector as you lower the amplifier chassis onto the power supply
chassis. Use the outer edges of the amplifier and power supply chassis as a
guide. The dimensions of the chassis are identical. When viewed from the top,
the power supply chassis will disappear beneath the amplifier chassis, indicat-
ing proper alignment of the feet, pins, and power connectors.
2 people needed
9.
Visually inspect the union between the amplifier and power supply chassis.
Verify that the each of the amplifier chassis feet has descended upon the
power supply chassis locating pins, and that both halves of the power connec-
tors have mated squarely with one another.
10.
Press firmly on the amplifier chassis to ensure that the connector is properly
engaged.
continued