10 Operation
10.2 Commissioning
WARNING
Risk of injury through emitted pumped liquid.
Pumped liquids can be hot, poisonous, combustible and caustic.
► Wear personal protective clothing during all the work. Ensure face protection.
► Collect any discharging pumped liquid safely and dispose of it in an environmentally compatible
manner in accordance with the applicable local regulations.
ATTENTION
Dry running can damage pump equipment.
► Ensure that the pump and the connected pipe system are filled properly.
► If the pump does not deliver after 10 – 15 seconds, abort commissioning.
Requirement:
ü
Pump station set up and connected correctly
ü
Motors connected correctly
ü
Pipe system is free of impurities
ü
Pump station filled
ü
Shut-off devices in the suction line and pressure line opened
ü
All connections connected sealingly
1.
Switch on the pump station.
ð
The pump station delivers when the pressure on the pressure side of the pump station rises.
2.
If the pump station does not deliver after 10–15 seconds of operation, abort commissioning, elim-
inate the cause of the fault and only then continue the commissioning procedure. Take the in-
formation from the fault table into account,
Ä
Troubleshooting, Page 33.
3.
Run the pump station for a few minutes to allow the pipe system to vent fully.
ð
The pipe system is fully vented when there is a smooth operating noise and a pressure gauge
on the pressure side of the pump shows no more fluctuations.
10.2.5
Venting the deaerator
The deaerator is a container above the strainer in which gas components from the medium collect. The
gas can be discharged via the screwed-on ball valve, thus preventing cavitation
2
1
3
1
Strainer
2
Deaerator
3
Ball valve
During commissioning vent the deaerator twice an hour.
Operation instructions
OIK 10en-GB Edition 2021-06