kozy heat NCK-C39-D Quick Start Manual Download Page 3

#NCK-C39-D

R.1

3

HUSSONG MFG. CO., INC.

 KOZY HEAT FIREPLACES

EN

Conversion Kit Components

(1) Gas Conversion Label
(1) 50% Turndown Stepper Motor*
(1) Gas Label
(1) Pilot Injector - Natural Gas: #.018NG
(2) Burner Orifices - Natural Gas: #44 FRONT; #45 BACK

*Not included in the appliance parts package. Contact your local dealer for more 
information.

High Altitude Conversions

For high altitude installations in the United States, refer to the 

American Gas Association guidelines for the gas designed appliances 

derating method. For elevations above 2,000’ (610m), input ratings are 

to be reduced by 4% for each 1,000’ (305m) above sea level. 
When the appliance is installed at elevations above 4,500’ (1,372m), 

the certified high altitude rating shall be reduced at the rate of 4% for 

each additional 1,000’ (305m). Refer also to CSA-B149.1 Natural Gas 

and Propane Installation Code, local authorities, or codes which have 

jurisdiction in your area regarding the derate guidelines.

CAUTION: The gas supply shall be shut off prior to disconnecting the 

electrical power, before proceeding with the conversion.

A.  Prepare the Fireplace

Step 1:  Remove the safety barrier and glass frame assembly.
Step 2:  Remove log set, panel set (if installed), and ember panel.
Step 3:  Remove the front burner and back burner tube from firebox.
Step 4:  Remove the back log plate and burner heat shield.

Refer to the installation manual for more information.

B.  Replace Burner Orifices

Step 1:  Remove the existing front and back orifice caps. See 

FIGURE 1.

Step 2:  Replace with the orifice caps included with this kit. Tighten cap 

securely. The sizes are stamped on the orifices.

Table 1, Burner Orifice Size at Elevations 0-4,500’ (1,372m)

Fuel

Front Orifice Size

Back Orifice Size

Natural Gas

#44 (DMS)

#45 (DMS)

C.  Convert Pilot Assembly

Step 1:  Remove (2) screws securing the pilot assembly to the pilot 

bracket.

Step 2:  Place a 

7/16

” wrench on the upper fitting and 1/2” wrench 

on the lower fitting, and loosen the pilot hood by turning 

counterclockwise. 

Step 3:  Remove the pilot hood and existing pilot orifice inside the 

lower fitting.

Step 4:  Install new pilot orifice included with the kit (number stamped 

on pilot orifices) into the lower fitting.

Step 5:  Reattach pilot hood and tighten using 

7/16

” wrench on the 

upper fitting and 1/2” wrench on the lower fitting. Fitting should 

be snug. DO NOT OVER-TIGHTEN! 

Step 6:  Verify the pilot hood is positioned as shown in 

FIGURE 2

. Finally 

alignment of flame sensor and hood outlet is critical for proper 

ignition. 

Step 7:  Attach pilot assembly to pilot bracket with screws previously 

removed. 

Flame sensor

Hood outlet

Remove existing

pilot orifice and

replace with one

included in kit

Upper fitting

Pilot bracket

Lower fitting

Pilot assembly

Front burner orifice

Back burner orifice

FIGURE 1, 

Location of Burner Orifices

FIGURE 2, 

Converted Pilot and Pilot Injectors

Summary of Contents for NCK-C39-D

Page 1: ...THE APPLIANCE This gas conversion kit installation instructions must be used in conjunction with the installation and operation manual provided with the appliance Please read the appliance owner s man...

Page 2: ......

Page 3: ...and burner heat shield Refer to the installation manual for more information B Replace Burner Orifices Step 1 Remove the existing front and back orifice caps See FIGURE 1 Step 2 Replace with the orif...

Page 4: ...enturi cap and adjust to the correct setting See FIGURE 5 and TABLE 2 Regardless of venturi orientation closing the air shutter will achieve a desired yellow flame but may produce soot on the glass Op...

Page 5: ...utlet pressure tap screw clockwise The screw should be snug do not over tighten Step 6 Relight the pilot and burner Step 7 Reattach the manometer to the outlet pressure tap to verify tap is completely...

Page 6: ...consulter le manuel d installation B Remplacement des orifices de br leurs tape 1 Retirez les orifices des br leurs avant et arri re Voir FIGURE 1 tape 2 Remplacez les par les orifices fournis avec c...

Page 7: ...ustez le au r glage appropri Voir FIGURE 5 et TABLEAU 2 tape 2 R duire l ouverture de l obturateur d air du venturi avant ou arri re donnera la couleur de flamme jaune d sir e mais cela peut encrasser...

Page 8: ...rd de test de pression de sortie sens horaire La vis doit tre viss e juste assez ne la serrez pas trop tape 6 Rallumez la veilleuse et le br leur tape 7 Rebranchez le manom tre au raccord de test de p...

Reviews: