#CLW-ST R.1 February 2021
Hussong Mfg. Co., Inc. • Kozy Heat Fireplaces
FRAMING
15
Figure 3.5, Stand-off Assembly Installation
3.4 Stand-off Assembly and Installation
WARNING: The top stand-offs MUST BE INSTALLED in order to maintain
clearance requirements for all design options except for shelf enclosure
framing applications. See Section 3.4.1.
WARNING: The CWST-SAK stand-offs and heat shield (sold separately)
MUST BE INSTALLED in order to maintain clearances requirements for
shelf enclosure framing applications. See Section 3.4.2 on page 16.
These clearances must be maintained.
3.4.1 Top Stand-off Assembly and Installation
1. Remove and save (4) screws securing top stand-off brackets on
top of the fireplace.
2. Form each top stand-off bracket by bending at perforations, as
shown.
3. Align the holes in the formed top stand-offs with the holes in
top of the fireplace. Secure with (4) screws previously removed
along with (4) located on top of the fireplace and (8) screws in
the components packet.
ALL DESIGN OPTIONS INSTALLATION