background image

5 | 

P a g e

 

 

 



Always wear a dust mask when cleaning the system and when removing ashes to avoid damages to 

your health.  



When setting the domestic water temperature above 60 °C, you have to ensure that the hot water is 

mixed with cold water to avoid scald.  



The pellet heater system may only be set up and operated in heating and plant rooms which 

comply with legal requirements.  



Provide an appropriate air relief valve on top of the boiler.  



Annual control of safety devices by a specialist.  



Regular control of expansion tank by a specialist.  



Regular control of pellet feeding devices, automatic ignition devices and feeding features.  



Please note that even when the system is turned off, different functions are in operation. 

(For 

example the anti-freeze protective device; pumps and mixers are moved periodically during the night 
avoid an accumulation of the storings). 

To ensure that no electricity runs through the system, take 

off the system from electricity. 

 



Make sure that the return temperature does not drop below 50 °C. Disregarding leads to expiry of 

warranty!  

 

 
 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Summary of Contents for Propel 25

Page 1: ...98 Lurgan Road Dromore Craigavon Co Down Northern Ireland BT25 1HL Tel 44 0 28 38 820 043 Fax 44 0 28 38 820 987 Email info geeltd org MODEL PROPEL BE SURE TO READ THIS MANUAL AND KEEP IT NEAR THE HEA...

Page 2: ...ction Page Introduction 3 Safety instructions 4 How to biomass system Works 6 Specifications 8 Installation 11 Operating the Heating system 14 Maintenance Overview 15 Troubleshooting 18 Installation S...

Page 3: ...horized qualified technicians Do not use any other fuels than specified below Norm M 7135 DIN PLUS Norm SWISSPELLET Diameter 6 mm Length 5 30 mm 20 45 mm DD CEN TS 14961 2005 Only this way low emissio...

Page 4: ...nance work Wait until the pellet boiler has cooled down check the temperature on the display The boiler needs to be switched off before carrying out the cleaning of the chimney Wait until the pellets...

Page 5: ...boiler Annual control of safety devices by a specialist Regular control of expansion tank by a specialist Regular control of pellet feeding devices automatic ignition devices and feeding features Ple...

Page 6: ...stand some of the terminology used to describe the systems operation Air Flow through the Biomass heating system 1 Fuel is fed from the fuel store via an auger The fuel is poured from the top into the...

Page 7: ...out 80 85 C 3 The fluid flows past an aquastat water thermostat that regulates the burn rate of the heating system in conjunction with the flue gas temperature sensor that measure the temperature in t...

Page 8: ...8 P a g e SPECIFICATIONS Propel 25 Propel 40...

Page 9: ...9 P a g e FOR PROPEL 25 FOR PROPEL 40 AIR ELIMINATOR VALVE BLOW OFF AIR ELIMINATOR VALVE BLOW OFF...

Page 10: ...ressure bar 3 3 Test Pressure 4 3 4 3 Max Suction Flow Rate Of Flue m h 60 100 Exhaust Fan sucktion pressure at full load pascal 7 10 Dimensions Total Weight kg 420 480 Water Content lt 65 127 Bunker...

Page 11: ...es all draw air from the room Be certain there is an adequate source of fresh air ventilation to offset these demands or you may create negative pressure in the room and prevent the heating system of...

Page 12: ...the chimney and determined it is suitable for use with a residential heating appliance that burns solid fuel 2 The chimney or flue should be at least 3 4 m tall and sized correctly for the Kozlusan He...

Page 13: ...13 P a g e This page intentionally left blank...

Page 14: ...OT throw fuel into the burnpot via the access door 8 Keep the access door closed tight except when tending the burnpot 9 Keep the heating system area clear of combustible materials gasoline and other...

Page 15: ...relief valve at least once a year 5 Check the water pressure is between 1 and 2 bar if too low top up system with more water 6 DO NOT clean heating system surfaces when the unit is hot Wait until the...

Page 16: ...nd to let the boiler cool down for at least 6 8 hours later switching off the system before proceeding with these works Yearly Maintenance Cleaning Heat exchanger and baffles Remove outer body cover a...

Page 17: ...est the intervals of the sensors grate motor separator Lubrication of the heat exchanger cleaning drive and grate bar Exhaust gas measurement Maintenance every 3 years Maintenance volume from the year...

Page 18: ...tive temperature sensor Inform customer service Error Back burning to auger The temperature of the augerexceeded the limit thermostat s value Back burning to auger Defective back burning detection the...

Page 19: ...w to heat up The boiler is on utility water operation mode Change operating mode Hydraulic problem Contact installer Altered heating curve Adjust Heating circuit pump is defect Inform customer service...

Page 20: ...20 P a g e...

Page 21: ...21 P a g e...

Page 22: ...22 P a g e...

Page 23: ...23 P a g e...

Page 24: ...24 P a g e...

Page 25: ...25 P a g e...

Reviews: