Kostal PIKO IQ Quick Start Manual Download Page 4

100%

0%

L1

L2

L3

N

A | B | GND

- KOSTAL Smart Energy Meter
- TQ EM 300 LR
- B+G SDM630-Modbus 

N PE

X452

Connection via RS485 (Modbus RTU Master)

Sensor position: Grid connection (Position 2)

Verbindung über RS485 (Modbus RTU Master)

Sensorposition: Netzanschlusspunkt (Position 2)

https://www.kostal-solar-electric.com/released-energy-meters-hybrid

L2

L1

L3

N

PE

PLENTICORE plus / PIKO IQ 

Released energy meters / 

Freigegebene Energiezähler 

PLENTICORE BI

- KOSTAL Smart Energy Meter

RS485

Modbus

LAN

L1

L2

L3

L1

L2

L3

N

LAN

STATUS
NETWORK
SERIAL BUS

REST

Smart Energy Meter

100%

0%

100%

0%

0,34-1,5 mm²/max. 30 m

100%

0%

L1

L2

L3

N

  WWW

LAN

LAN

Cat 6/max. 100 m

KOSTAL SOLAR WEBSHOP

shop.kostal-solar-electric.com

www.kostal-solar-electric.com

To connect a battery to the DC3 input of the 

PLENTICORE plus, an activation code battery 

must be purchased. 

Um eine Batterie am DC3-Eingang am 

PLENTICORE plus anzuschließen, muss ein 

Aktivierungscode Batterie gekauft werden. 

optional with code

optional mit Code

BMS

DC3

Code required only for PLENTICORE plus 

 

Code erforderlich nur für PLENTICORE plus

L1

L2

L3

N

BMS

GND 0V

RS485 B RS485 A

VDD +12-14V

DC=

OFF

ON

BMS

X601

Battery only for / 

Batterie nur mit

PLENTICORE plus (optional with code / 

optional mit Code

)

PLENTICORE BI

Cat.5e / 0,34-1,5 mm² / max. 30 m

Released batteries / 

F

reigegebene Batterien

https://www.kostal-solar-electric.com/plenticore_released_batteries

 

5. Connect LAN communication | 

LAN Kommunikation anschließen

6. Connect battery communication | 

Batterie Kommunikation anschließen

4. Connect Energy meter in grid position | 

Energiezähler anschließen am Netzanschlusspunkt