
FR;GB-030B_f.1105
17
Installation
1. Hang the boiler up in a vertical position on fixing screws
with inlet and outlet pipes to the bottom, maintaining
clearances from the walls and the ceiling.
2. Connect the boiler to a central heating system equipped
with cut-off valves.
3. Fill the central heating system with a treated water, that
extends the life of the heating elements.
4. Vent the central heating system.
5. Connect a boiler to the electrical system.
6. Fix the room thermostat, in accordance with manual
instruction.
7. Connect the room thermostat (by using two wires 2 x
0,35 mm
2
) to the terminal of control panel (RP entry).
8. Once you have finished the above procedures, you can
start the boiler. See the „Start-up” section.
GB