![Korea Nakajo NSM-25G0MW User Manual Download Page 7](http://html1.mh-extra.com/html/korea-nakajo/nsm-25g0mw/nsm-25g0mw_user-manual_1997697007.webp)
7
2
Operation
2-1 Installing tank and hose for Ice making material
Installing material supply hose
① After pulling up lever pin, make a little crack
② Insert middle part of the hose out of bracket
③ In order to avoid hose twisted, roll it into roller and attach it at groove on lever and
insert lever pin into hole and fix hose on bracket
④ Insert pipe into the end of water supply hose falling down and put it naturally into material
tank(Not making water supply hose folding or twisted, make its end attached
to the floor of material container)
Installing material container
① Insert material container to upper part groove
② By inserting stainless pipe into the end of material supply, put it naturally into ice making
water tank(Not making ice making material supply hose folding or twisted, make the end of the
hose attached to the floor of the material container)
Summary of Contents for NSM-25G0MW
Page 14: ...14 Memo...