Koolr red rack DIAMOND F05 A Assembly Installation Manual Download Page 7

The stackable system is available in 2 heights A (32”) and B (48”) allowing 

for the following modularity:

Base / Crown molding and quarter round (optional) can be added to AA and 

AB configurations for 8’ ceiling height. 

Base / Crown trim addition to BB requires min. 99” ceiling height.

MULTIPLE MODULES

If installing multiple modules, screw adjoining racks together.  Fasten 

through adjoining bars with 7/8” screws at top, middle and bottom rows, 

as shown 

(Take the diamond slats out for more space).  

To avoid cracking, pre-drill 1/16” holes for screws. Fasten through rear 

rack sections as well as front.  If stacking modules, fasten adjoining 

horizontal bars in at least two places.  For additional strength and sta-

bility, fasten through bottom horizontal bars into base or floor with 7/8” 

screws or nails. 

NOTE :

 All the above configurations assure alignment of modules

Nominal 48” B modules are 47 3/4” to allow for stacking in a nominal 

           8’ ceiling room. 

32"

48"   

*

WIDTH"

96"   

*

80"

48"

A

A

A

B

A

B

B

B

B

64"

AA

AB

BB

*

Summary of Contents for red rack DIAMOND F05 A

Page 1: ...6 B 16 x 48 DIAMOND F05 B 32 x 48 BORDEAUX BIN CARDBOARD CASE F06 A 16 x 32 DIAMOND F05 A 32 x 32 BURGUNDY BORDEAUX BIN F07 A 16 x 32 BURGUNDY BORDEAUX BIN F07 B 16 x 48 CHAMPAGNE MAGNUM F08 A 16 x 32...

Page 2: ...HARDWARE 1 2 Screw x 12 1 1 4 Screw x 8 Anchor x 8 Nails x 48 Bracket x 4 7 8 Screw x 8 Vertical Bar Horizontal Bar Diamond Slat 8 1 1 1 8 Finishing Nailer Highly recommended to prevent splitting of w...

Page 3: ...re that the front has the best bars Arrange four horizontal bars with the notches up for the rack Join the vertical bars to the horizontal bars by interlocking the bars at notches IMPORTANT NOTE Bin a...

Page 4: ...rizontal bars at the posi tions shown with 1 2 screws though rear holes of brackets NOTE Install bracket under horizontal bar figure A NAIL BARS Nail at intersections for a good hold figure A Nail thr...

Page 5: ...e Trim Kit before mounting rack to wall Shown on last page Stand rear rack up against wall where it is to be fastened Mark through bracket holes with a pencil where plastic anchors should be installed...

Page 6: ...forward Fasten brackets to bars with 1 2 screws figure A Stand front rack into position horizontal bar facing forward and fasten bracket to bars with 1 2 screws figure A Set rack assembly to wall lini...

Page 7: ...8 screws at top middle and bottom rows as shown Take the diamond slats out for more space To avoid cracking pre drill 1 16 holes for screws Fasten through rear rack sections as well as front If stack...

Page 8: ...breakage of wine It is your own responsibility to insure your wine and to take all reasonable and necessary precautions to safeguard its condition Koolr Products Inc 2011 Use of Red Rack is strictly a...

Reviews: