
Sager® Emergency Traction Splints and the Minto Fracture Kit
17
Rapid one person assembly and application. The splint can be
assem bled and applied in under 2.5 minutes. To assemble the splint,
simply unfoldand secure into place. The Sager
®
splint has a unique
semi-attached design that ensures that no major parts will be lost
or incorrectly assembled.
Training application sheet #1:
Model SX404 traction splint.
1
Remove and unfold the outer shaft assembly.
2
Remove, unfold and lock the inner shaft assembly.
3
Insert inner shaft assembly into the outer shaft
assembly. Splint is ready to apply.
Position:
a
Position the Sager® Splint between the
patient’s legs, resting the the saddle
against the ischial tuberosity, with the
shortest end of the articulat ing base
towards the ground.
Set:
b
Fold down the number of comfort
cushions needed to engage the ankle
above the medial and lateral malleoli.
c
Using the attached hook and loop
straps wrap the ankle harness around
the ankle to secure snugly.
d
Pull control tabs to engage the ankle
harness tightly against the crossbar.
Apply
Quantifiable, Dynamic
Traction™
. Grasp the padded shaft of
the Sager® Splint with one hand and
the red traction handle with the
other; gently extend the inner shaft
until the desired amount of traction
is recorded on the traction scale.
Secure:
e
Adjust the thigh strap at the upper thigh making sure it is not too tight, but snug
and secure, then firmly secure the tensor cravats.
f
Apply the figure 8 strap around the feet to prevent rotation. Note the absence or
presence of distal pulses, check for sensation. Patient is now ready for transport.
(PowerPoint #9-11)