KÖNIG & MEYER
GmbH & Co. KG
Kiesweg 2, 97877 Wertheim, www.k-m.de
11914-000-55 / 11915-000-55 Rev.11 / Rev.10 03-79-244-00 10/20
SETUP INSTRUCTIONS
11914/11915
Orchestra music stand
INTENDED USE
Stylish and uncomplicated. An orchestra music stand
with special suitability for schools and orchestra
CHARACTERISTICS & SKILLS
- max. load capacity 2.8 kg
- Height adjustment: infinitely variable and without clamping
-
elements, simply by moving the tube combination
- Infinitely tiltable music stand top
- Integrated, impact sound absorbing parquet protectors
- The base construction has three main advantages:
-
it is extremely flat, extremely rigid and yet very easy to
-
remove from the base tube (without tools), making it ideal
- Height of the support: 650 -1185 mm;
-
music stand top: 500 x 320 mm
SAFETY INSTRUCTIONS
Thank you very much for choosing this product. Please read and follow these
instructions carefully. They inform you about all important steps regarding
assembly and handling. We recommend that you keep them for future reference.
1. COMPONENTS
Visually check that all parts are present and in good condition.
a
Base construction
b
Rod combination
c
Music desk
d
Desk mount accessories
c
d.1
Joint half shell (2x)
c
d.2
Rubber washer ø 30 mm (2x)
c
d.3
Washer with square hole
c
d.4
Washer ø 8,5 mm
c
d.5
Locking screw M8 x 50 mm
c
d.6
Clamping nut M8
2. MOUNTING the DESK to the EXTRACTION TUBE
2.1
Place the music desk
c
on the floor or the table
2.1
so that the back is facing upwards.
2.2
Pull the extension tube slightly out of the base tube.
2.3
Place the joint half-shells
d.1
around the tube end
b.1
.
2.3
The spigots engage in the respective holes.
2.4
Press the rubber washers
d.2
into the recesses
2.4
of the joint half-shells
d.1
and…
2.5
…push this ensemble between the two retaining
2.5
straps on the back of the music desk until
2.5
the holes in all parts are aligned.
2.6
Place the washer with square hole
d.3
over the
2.6
locking screw
d.5
and guide it through the bore of
2.6
the holding brackets
2.7
Slide the washer
d.4
over the thread and secure
2.7
the connection with an M8 clamping nut
d.6
.
3. MOUNTING the LEG CONSTRUCTION
3.1
Place the leg construction
a
on the floor with the
3.1
central screw socket pointing upwards.
3.2
Place the threaded bolt
b.1
of the base tube on
3.2
these threaded bush...
3.3
…and screw them into the leg construction up
3.3
to the stop.
3.4
NOTE!
3.4
If there is a gap between the base tube and leg,
3.4
the stand will wobble. Therefore, always tighten
3.4
the threads as far as they will go.
3.5
DISMANTLING is carried out in reverse order.
- max. 2.8 kg load capacity
- center the load
- ensure that the surface is suitable and level
- Due to the moving parts, there is a risk of entrapment:
-
careful handling during assembly, operation and
-
dismantling is therefore essential.
1. COMPONENTS
Art.-Nr.: 11914
Steel desk
Art.-Nr.: 11915
Polycarbonat desk
2. MOUNTING the DESK to the EXTRACTION TUBE
3. MOUNTING the LEG CONSTRUCTION