
ViZion DR + Install Guide v2.6
Opal UAI 2.3.x.x
7
Customer Support
1.800.366.5343 –
VZ0001HTG201507-2.6
2.
Attach platform to base.
3.
Attach Base to Monitor.
4.
Cover wall mount screws with provided cover.
5.
Insert power cable into monitor and plug power cable into wall outlet.
6.
Insert blue VGA cable into monitor VGA port. (May arrive connected)
NOTE:
For ELO touch screen monitors a USB cable and Serial cable will be included in the box. Attach the USB cable to
the monitor.