background image

E-3

9. Remove the screw from the staple waste box.
10. Remove the screw from the locking material at

the back of the stacker, and pull out the stacker.

11. Remove the locking material at the back of the

stacker (1 screw).

12. Loosen the two rail-stopper fixing screws, and

pull out the stacker further.

13. Remove staple-locking material/1 (7 screws).

14. Remove staple-locking material/2 (2 screws).

15. Remove the two locking materials on the left side

of the stacker (2 screws each).

15VFIXE003SA

Locking
material

Staple waste 
box screw

15VFIXE004SA

Locking material

A10UIXC007CA

Rail-stopper fixing screw

Rail-stopper fixing screw

15VFIXE005SA

staple-locking material/1

15VFIXE006SA

staple-locking material/2

15VFIXE007SA

Locking materials

Reviews: