E-2
V. Unpacking the machine
1. Open the shipping box and take out the IU ship-
ping box and packaging material.
Note:
Save the slope and cushion removed here for later
use.
2. Remove the fixing material (upper).
3. Hold onto the handle of the machine and tilt the
machine to the right and left. Under this condition,
remove the mirror mat and fixing material (lower).
4. Separate the cushion into two and install them to
the pallet (at two places).
5. Take out the slope and protective tape and
remove nails from the plastic bag.
A0P0IXC014DB
Cushion
Slope
A0P0IXC015DA
A0P0IXC016DB
A0P0IXC017DB
A0P0IXC018DB
A0P0IXC019DA
A0P0IXC067DA
6. Position the slope as illustrated and drive nails in
to fix the slope in position.
Note:
Insert the nails in the outer holes.
7. Holding onto the front cover and the back panel
of the machine, slide the machine down along the
slope.
Note:
Machine mass: 217 kg (478-1/2 lb)
• Perform this step on a level, stable site and
assign an adequate number of persons.
• When sliding the machine down, do not hold
onto the IR portion.
• Do not insert your leg under the slope.
VI. Removing protective tape, packing and
other shipping materials
1. Remove the protective tape and protective mate-
rial.
Note:
After removing protective tape B, be sure to lock
the lever.
A0P0IXC020DA
A0P0IXC021DA
A0P0IXE069DE
A0P0IXC092DA
B
A0P0IXE070DB
A0P0IXC044DB
A
<Viewed from point A>