Chapter 7 Periodic Maintenance
7-16
7.2.12 Move to the Installed Location
Move the equipment back to the installed location if it was moved.
1
Move the optical unit to the second front side and
fix it using the simple fixing lock.
2
Move the equipment back to the installed
location.
3
Release the lock on the optical unit.
4
Fix the equipment using the adjuster (4 locations).
Check the level inside the second front door and make
sure the bubble is inside the circle.
5
Gently push the equipment to confirm that it is
fixed firmly.
This completes the movement to the installed location.
Go to
and turn the power ON on the equipment.
7.2.13 Power ON
Connect the Ethernet cable and power cable to the equipment and turn ON the power.
1
Connect the Ethernet cable and the power supply cable.
2
Turn ON the power supply circuit breaker.
3
Press the "operation" switch.
Operation is possible once "READY" is displayed in the message display window.
This completes the maintenance operation performed annually.
Important
Push the optical unit slightly towards the
back when pulling up the knob. Fixing shaft
might move down, and get locked again if
the optical unit is at its hithermost position.
Also, move the optical unit to confirm that
the fixing shaft is not lowered after
unlocking.
Level
Summary of Contents for 0902
Page 2: ......
Page 6: ......
Page 12: ......
Page 30: ...2 10...
Page 54: ......
Page 84: ...Chapter 3 Troubleshooting 3 30 3 2 19 Confirm the H sync Signal To be stated...
Page 85: ...Chapter 3 Troubleshooting 3 31 3 2 20 Confirm the LMC Operation To be stated...
Page 120: ......
Page 296: ...8 10...
Page 300: ......
Page 301: ......