Chapter 5 Disassembly and Assembly
5-28
7
Install the light shield cover that was removed in
•
1 tapping screw (M4 x 10)
•
1 screw (M4 x 8)
Attach the sponge to the right side of the light shield
cover, and wrap the cable with it.
8
Installation Procedures (Page 5-8)"
"5.2.3 Removing/Installing the Exterior Panel
to install the insertion unit and exterior panel.
Now, you have finished with the procedures to replace the insertion slot detection sensor (LLB).
5.3.8 Replacing the Insertion Slot Detection Sensors (LPB)
This section describes the instructions on how to replace the insertion slot detection sensors (LPB).
Work outline
Listed below are the number of people and the rough standard of work hours required for performing the
works described in this section.
Requirements
Shown below are the tools requiring to be prepared in addition to the standard tools before performing the
works in this section.
1
Removal Procedures (Page 5-6)"
"5.2.3 Removing/Installing the Exterior Panel and
to remove the insertion unit.
Reverse the removed insertion unit and place it in a stable place in order to perform the replacing work.
2
Unplug the cables connected to the shutter unit
assembly.
•
Connector (JP20): shutter motor
•
Connector (JP36): shutter close detection sensor
•
Connector (JP35): shutter open detection sensor
•
Grounding cable: 1 hex/Phillips-head screw (M5 x 10)
Caution
Be sure to turn off the power supply circuit breaker and unplug the power cable from the
equipment whenever you disassemble/assemble the equipment.
Personnel
Number
Work Hours (steps 2 to 12)
1
No.
Tool
1
0.2 mm spacer (film, etc.)
A piece of film has about 0.2 mm in thickness.
JP20
JP35
JP36
Grounding Cable
Caution
When removing the connector, hold a notch
on the connector without pulling a cable.
Giving a strong pull to the cable may cause
it to be broken.
Summary of Contents for 0902
Page 2: ......
Page 6: ......
Page 12: ......
Page 30: ...2 10...
Page 54: ......
Page 84: ...Chapter 3 Troubleshooting 3 30 3 2 19 Confirm the H sync Signal To be stated...
Page 85: ...Chapter 3 Troubleshooting 3 31 3 2 20 Confirm the LMC Operation To be stated...
Page 120: ......
Page 296: ...8 10...
Page 300: ......
Page 301: ......