12 - reinstall the upper panel with the 4 screws. It can
be necessary to press the side panels slightly, to align
the screw holes.
13 - reconnect the drain hoses and refit the blower
covers.
14 - power supply to the control box is guided through
the relief union as indicated.
9 - the final connection should now look like this. Tight
-
en the cable relief and re-install the connection box lid.
10 - tighten the cable relief for power supply and ther-
mistor cables.
11 - install the potential equalizing cable, and tighten
the nut securely (the right terminal is for grounding to
the plant).
9
Summary of Contents for MULTIAIR FCE
Page 27: ...27 ...