9
INSTALLATION OF PRODUCT
9.1 Installation Scheme and Parts
Fig. 11: INSTALLATION AND PARTS
1- Internal Flue
2- External Flue
3- Body
4- Product Rack Sheet
5- 2x 5.5x60 Wall Rack Screw
6- 2x Ø10mm Plastic Pin
7- 2x 3.9x22 Screw
8- Flue Connection Metallic Sheet
9- 2x Ø6mm Plastic Pin
n
Install the hood using the installation scheme.
n
Check the minimum and maximum distance according to work-
bench and drill points A, B.(Fig. 11)
n
Place Ø10mm pins in drilled A, B points and screw the screws
to A+B points leaving 5 mm gap between screw head and the
n
Hang the hood on the wall using A, B points.
INSTALLATION OF PRODUCT
Installation Scheme and Parts
06.12.2017
TJBC00 ENGLISH
20
Summary of Contents for NZ60LIK
Page 1: ...UPUTE ZA UPORABU KUHINJSKA NAPA COOKER HOOD INSTRUCTION MANUAL EN HR NZ60LIK...
Page 15: ...2 Tehni ki nacrt Slika 1 TJBC00 Tehni ki nacrt 12 12 2017 TJBC00 HRVATSKI 5...
Page 38: ...TJBC00 ENGLISH HOOD USER GUIDE TJBC00 60 cm Read this manual prior to performing any task...
Page 42: ...2 Technical Drawing Fig 1 TJBC00 Technical Drawing 06 12 2017 TJBC00 ENGLISH 5...