OPTIONS, ATTACHMENTS
ROTATING ARM
351
MAINTENANCE
MAINTENANCE REQUIREMENT
The following maintenance should be carried out in addition to
that in the PW160-7K Operation & Maintenance Manual.
EVERY 100 HOURS SERVICE
1. Arm rotation machinery case
1.
Set the arm horizontal.
2.
Remove plug (1) and check whether final drive case is filled
with oil to lower edge of plughole. If oil level is below this
point, refill with SAE 90 gear oil through plug hole.("EVERY
1000 HOURS SERVICE (353)")
●
Tightening torque: 56 kgm
●
The type of lubricant used depends on the ambient tempera-
ture.
Select according to the table "USE FUEL, COOLANT AND
LUBRICANTS ACCORDING TO AMBIENT TEMPERA-
TURE (234)"
NO
ITEM
SERVICE
PAGE
EVERY 100 HOURS SERVICE
1
Arm rotation machinery case
Check and supply
EVERY 250 HOURS SERVICE
2
Arm rotation circle
Lubricate 1 point
EVERY 500 HOURS SERVICE
3
Arm rotation machinery case
Check and supply
EVERY 1000 HOURS SERVICE
4
Arm rotation machinery case
Change oil
Summary of Contents for PW160-7K Series
Page 2: ......
Page 3: ...3 FOREWORD ...
Page 14: ...LOCATIONS OF PLATES TABLE TO ENTER SERIAL NO AND DISTRIBUTOR FOREWORD 14 ...
Page 20: ...20 ...
Page 222: ...TROUBLESHOOTING OPERATION 222 ...
Page 304: ...SERVICE PROCEDURE MAINTENANCE 304 ...
Page 305: ...305 SPECIFICATIONS ...
Page 307: ...SPECIFICATIONS SPECIFICATIONS 307 1 PIECE BOOM ...
Page 308: ...SPECIFICATIONS SPECIFICATIONS 308 2 PIECE BOOM ...
Page 312: ...SPECIFICATIONS SPECIFICATIONS 312 ...
Page 354: ...ROTATING ARM OPTIONS ATTACHMENTS 354 ...
Page 357: ......