INTRODUCTION
FOREWORD
1-12
RUNNING-IN
1
All machines have been meticulously adjusted and tested before delivery.
However, a new machine must be used with caution during the first 100 hours, for a correct running in of the
different components.
If the machine is subjected to excessive work load at the beginning of operation, its potential productivity and its
functionality will be shortly and untimely reduced. For more details, see "Running-in (3-136)".
WEAM014802
Summary of Contents for PC118MR-8
Page 1: ......
Page 2: ......
Page 3: ...FOREWORD 11 WEAM014802...
Page 5: ...FOREWORD FOREWORD 1 3 Storage location for the Operation and Maintenance Manual WEAM014802...
Page 27: ...SAFETY SAFETY LABELS 2 3 LOCATION OF SAFETY LABELS 2 WEAM014802...
Page 84: ...SAFETY MAINTENANCE INFORMATION SAFETY 2 60 WEAM014802...
Page 304: ...LUBRICATION MAINTENANCE 4 18 2 PIECE BOOM 4 Grease Filter Oil WEAM014802...
Page 379: ...SPECIFICATIONS 15 WEAM014802...
Page 390: ...LIFTING CAPACITIES TABLES SPECIFICATIONS 5 12 WEAM014802...
Page 416: ...INSTALLING AND REMOVING THE ADDITIONAL COUNTERWEIGHT OPTIONAL EQUIPMENT 6 26 WEAM014802...
Page 417: ......
Page 418: ......