![Komatsu KOMTRAX Instruction Manual Download Page 32](http://html1.mh-extra.com/html/komatsu/komtrax/komtrax_instruction-manual_1991315032.webp)
- 32 -
17.4.
Auto time study (Press)
By downloading production information of the machine as csv file, analyzed time study diagram is
shown.
Explanation of monitor information
1)
Appoint period
Set period to output.
2)
Update
Update screen data to show for the appoint period.
3)
CSV download
Parts event information of the load within the appoint period is
downloaded as csv file.
How to use the downloaded csv file
Import the downloaded csv file on the support tool (excel macro program) then a following diagram is
generated.
①
①
②
②
③
③
Summary of Contents for KOMTRAX
Page 33: ...33...