SERVICE PROCEDURE
MAINTENANCE
4-46
EVERY 250 HOURS SERVICE
4
LUBRICATING
1.
Lower the work equipment to the ground, then stop the engine.
2.
Using a grease pump, pump in grease through the grease fittings shown by arrows.
3.
After greasing, wipe off any old grease that was pushed out.
q
Grease equalizer bar side pin (4 places)
Left and right sides of machine: 2 places each
1) Remove all soil and mud from the top of track frame and
cover (1).
2) Climb on top of the straight frame and remove the red plug
from (A) between the track frame and track shoe.
3) Carry out the greasing from the top of the track shoe.
Parts to use (supplied parts)
q
Grease pump ass'y (07952-80002)
q
Nozzle (07951-41043): Tube type
Summary of Contents for 76243
Page 2: ......
Page 3: ...FOREWORD 11 ...
Page 5: ...FOREWORD FOREWORD 1 3 q Machine equipped without cab Back pocket of operator s seat ...
Page 16: ...NECESSARY INFORMATION FOREWORD 1 14 ...
Page 17: ...FOREWORD NECESSARY INFORMATION 1 15 ...
Page 24: ...CONTENTS 1 22 ...
Page 28: ...SAFETY LABELS SAFETY 2 4 SAFETY LABELS 2 POSITIONS OF SAFETY PICTOGRAMS 2 ...
Page 289: ...SPECIFICATIONS 15 ...
Page 297: ...INDEX 17 ...
Page 298: ...INDEX 7 2 ...
Page 301: ...COLOPHON 18 ...