Apply sealant in accordance with the sealant manufacturers instructions along 

the outside surfaces of the door frame only.

(b)

  Allow the silicone sealant to cure for 24 hours before use.

Summary of Contents for Skyline Pivot Pentagon

Page 1: ...1 1180583 W2 B These instructions must be left with the user Installation Guide Skyline Pentagon Enclosure...

Page 2: ...2 1180583 W2 B...

Page 3: ...d flat and even wall surface Failure to do so will result in an unsatisfactory seal which may cause property damage INTRODUCTION Thank you for purchasing a quality KOHLER product To enjoy the full pot...

Page 4: ...purchase For non domestic installations we guarantee the product against any defect in materials or workmanship for a period of one year from the date of purchase For terms and conditions refer to th...

Page 5: ...5 1180583 W2 B PACK CONTENTS x 2 Pack 1 Pack 2 X 1 q X 1 q X 1 q X 1 q...

Page 6: ...e tray surface during enclosure installation Height of Enclosure mm 1900 Min Max Frame Adjustment Enclosure Size Minimum mm Maximum mm 900 x 900 867 897 1200 x 900 1200 1167 1197 900 867 897 a Install...

Page 7: ...g holes then remove the wall channel c Drill with a 6 mm masonry bit not supplied and plug using the wall plugs supplied with the door d Position the wall channel on the wall and install the fixing sc...

Page 8: ...ng holes then remove the wall channel c Drill with a 6 mm masonry bit not supplied and plug using the wall plugs supplied with the door d Position the wall channel on the wall and install the fixing s...

Page 9: ...9 1180583 W2 B 4 a Install the side panels over the wall channels that had been secured to the wall earlier b Adjust the side panels so that they are in the correct position...

Page 10: ...10 1180583 W2 B 5 a Install the door in position b Push the side panel and the door frame together until the extrusions engage and lock together Side Panel Door Panel...

Page 11: ...11 1180583 W2 B 5 6 a Centralise the door frame within the wall channels making sure that the door frame is square 0 mm...

Page 12: ...12 1180583 W2 B L R 90 5 7 a Using the 3 0 mm hexagonal wrench supplied turn through 90 in three locations to lock the door frame in position Repeat this on the other wall channel X3 3 0 mm...

Page 13: ...8 1 2 a Install the infill strip as shown above to both sides working from top to bottom b Refer to the door installation instructions to lock the door frame to the side panels in three positions on...

Page 14: ...1180583 W2 B 5 9 a Apply sealant in accordance with the sealant manufacturers instructions along the outside surfaces of the door frame only b Allow the silicone sealant to cure for 24 hours before u...

Page 15: ...15 1180583 W2 B 5 10 1 2 a Fit the covers to the top of the extrusions b For adjustment of the doors refer to the Installation and User guide packed with the door...

Page 16: ...s These finishes should be cleaned with a mild washing up detergent or soap solution and then wiped dry using a soft cloth Care To preserve the beauty of your shower enclosure for many years please ob...

Page 17: ...17 1180583 W2 B SPARE PARTS LH Pent Panel 3 1 2 2 2 1 1781 459 Pent Panel Top Cap Pack 2 1781 380 Locking Mechanism Spare 3 1781 381 Infill Spare...

Page 18: ...18 1180583 W2 B RH Pent Panel 3 1 2 2 2 1 1781 459 Pent Panel Top Cap Pack 2 1781 380 Locking Mechanism Spare 3 1781 381 Infill Spare...

Page 19: ...19 1180583 W2 B NOTES...

Page 20: ...arry out service or repair work to your product both during and after the guarantee period Ask about our fixed price service repairs Guarantee Your enclosure has the benefit of our lifetime guarantee...